WHY US?

Our approach to automation is the same irrespective of whether it is an upgrade project or a new installation. At the core, our aim is to deliver to you all the benefits that digital technology in automation affords. We understand that automation system is an investment and you expect immediate returns in terms of safety, reliability, efficiency, and being able to be in full control of your operations.

You can count on our team of experts to realize that by supporting you through the entire life cycle of your automation and allied systems. Right from needs assessment to design and engineering to manufacturing, installation, commissioning and after sales support, we will have all covered. With us by your side, you don’t have to worry about exorbitant costs and delays in availing services for such systems.

With our modern manufacturing facility located in Chukha, BHUTAN AUTOMATION is a very convenient one-stop place for all your automation needs. You can take advantage of our complete range of automation and control solutions to achieve optimal design and implementation of your automation systems, which are consistent with your actual requirements. Our products are well-integrated, state-of-the-art, and future proof. Therefore, the risk to your automation project and associated investment is reduced.

ABOUT US

PRODUCTS

SCADA Systems

Integrate & Operate…

Protection & Control Panels

Enhance Safety & Efficiency…

Instrumentation

Eyes & Ears to your System…

Turbine Speed Governors

Gain Control & Stability…

Excitation Systems

For a Healthy Voltage Pulse…

Condition Monitoring

Look beyond Control & Monitoring…

OUR PROJECTS

Basochhu Hydropower Plant (BHP)

Kurichhu Hydropower Plant (KHP)

Punatsangchhu Hydroelectric Project Authority (PHPA – II)

Bhutan Power Corporation Limited (BPC)

LATEST NEWS

Bjimthangkha, Wangdue Phodrang: Signing of the Contract Agreement for the Computerized Control System and Protection…

The last Unit of (4 x 15 MW) Kurichhu Hydropower Plant (KHP) was successfully commissioned…

The obsolete numerical protection relays at the Upper (2 x 12 MW) and Lower (2…

The SCADA system at the 66 kV Olakha Substation under BPC was successfully commissioned on…