12
01 '21
The obsolete numerical protection relays at the Upper (2 x 12 MW) and Lower (2 x 20 MW) stages of Basochhu Hydropower Plant (BHP) were successfully retrofitted with the latest HIPASE-P IEDs in December 2020. The HIPASE-P device has a full graphic color touch display for local unit operation. The touch display provides a means…