An “out-house” mock drill was conducted at the BHUTAN AUTOMATION facility on 19 September 2020. Execution of the mock drill was supported by the Fire, Safety, and Disaster Management Unit (FSDMU) of Chukha Hydropower Plant.

The main objective of the mock drill was to prepare the employees and the Company as a whole in dealing with emergency situations and also in evaluating the standard operation procedure, which was developed with the help of the FSDMU.